MIVARE LABS SITES CONSTRUCTION MANAGEMENT SOFTWARE
Objects. Mivare Sites Help Centre
AREA 01 · SITES AND OBJECTS · TOPIC 02

Objects

An object is the physical layer: a building, a hall, grounds or an installation. Floor plans, fire safety devices and penetrations hang off it. An object outlives a site and moves through the next ones, and its card shows the whole history of a building on one screen.

IN THE APP
Modules › Sites and objects › Objects
CUSTOMER
Assigned to the object
OUTLIVES A SITE
Construction, service, refurbishment
CONNECTIONS
8 modules

01What it is

Objects is the register of the buildings, halls, grounds, installations and units the company works on. Each object has a type, a stage from planned to out of use, an address, floors, area, a handover date and the end of its warranty.

An object with no site is correct: that is what a building you only service looks like. You attach it to a site from the site card, and the same building can go through construction, then a system replacement and a refurbishment.

The customer is assigned to the object, not to the site. The Fire safety by customer overview relies on this assignment.

BUILDING HISTORY
Floor plans, devices, issues and projects on one card.
INSPECTION DATES
The number of fire safety devices, with a warning about how many are overdue.
TIMELINE FOR DISPUTES
Photos, entries and reports from a chosen period in one view.

02What it is for

The state of an object in one place

Devices with their next due date, open issues and the projects that concern it.

Inspections month by month

A chart shows how many devices are due in each month and how many are already overdue.

Evidence in a dispute

The timeline puts the photo from the first day of work next to the issues and reports from that period.

Serving the building manager

The customer assigned to the object sees the fire safety state of all their buildings.

03Main options

The object card has tabs: Floor plans, Overview, Fire equipment, Issues, Projects, Photos, Documents and Timeline. An object with a plan opens on Floor plans. The four used most often are described below.

Object data and sites

Address, size and dates, and the sites the object has taken or is taking part in.

  • Address, floors, area and coordinates
  • Handover date and warranty end
  • Sites with the period of the object’s participation
  • A chart of device inspections in the coming months
Overview

04Tasks step by step

  1. STEP 1Open Modules › Sites and objects › Objects and choose New object.
  2. STEP 2Enter the name, choose the type and stage and, if the building has a manager, select the customer.
  3. STEP 3Fill in the address and coordinates. Without coordinates the object appears neither on the map nor on the inspection route.

05Actions

The most common tasks on an object.

New object

A building, hall, grounds or installation.

Add floor plan

A drawing of a level for markers and devices.

Add a device

A fire safety device with an activity schedule.

Report a problem

An issue pinned to this object.

Show object reports

The inspection reports of this object.

Timeline

The object’s history within a chosen date range.

06What it connects to

Choose a module to see how it uses the object.

SITES AND OBJECTS

Sites

You attach the object from the site card; it can belong to several sites.

Go to the topicSites