A building with its history
A building, hall or unit with its address, floors, handover date and end of warranty. The same building goes through construction, installation replacement and servicing.
BUILDINGFLOOR PLANMARKERHANDOVER
A building, hall or unit with its address, floors, handover date and end of warranty. The same building goes through construction, installation replacement and servicing.
A penetration, seal, measurement or defect placed on the building drawing, exactly where it really is.
A completed penetration has a seal number, fire resistance, manufacturer, material and two photos: one of the installation and one of the label.
A marker goes through completion and approval or goes back for correction. Correcting an approved marker returns it to draft.
A defect has a priority, an impact on the schedule, a person responsible and a due date. An urgent one gets a response time and goes to notifications.
A reservation ties cables, pipes and fittings to the project before someone takes them to another site.
Crews assigned to sites on specific days, with check-ins confirmed by phone within the site radius.
An extra point or a rerouted run described with its value and impact on the schedule, approved by the client before the work is done.
INSTALLATIONHANDOVERWARRANTY
If you service fire protection equipment after installation, the equipment register, inspection dates, reports and service technicians’ routes are described on a separate page.
Fire protection for buildingsInstallation, handover and later inspections recorded on the same building.
Add a building where you are doing an installation right now, upload a floor plan and mark the first penetration. You will see what documentation looks like when it is created along with the work.
The features described here are included in the licence.