Skip to content
MIVARE LABS SITES CONSTRUCTION MANAGEMENT SOFTWARE
INSTALLATION FIRM · Mivare Sites
INSTALLATION FIRM

What you cannot see after handover is worth documenting well.

Record the history of work on the building, mark important spots on the floor plan and attach photos of firestop penetrations. On the job you also keep material reservations and approved scope changes.

FEATURES FOR INSTALLATION FIRMS

Electrical, plumbing, ventilation in one building history.

BUILDINGFLOOR PLANMARKERHANDOVER

A building with its history

Keep the history of a building, hall or unit: from installation and handover to later servicing work.

Markers on the floor plan

Mark the spot of a penetration, seal, measurement or defect on the floor plan, so your team can find it more easily.

Firestop penetrations with photos

Record the material, fire resistance and seal number. Attach photos of the installation and the label.

Draft, done, approved

Check which points have been done and approved, and which need correcting.

Issues from the building

For each issue, set the priority, the person responsible and the deadline. Record too whether the defect affects the schedule.

Materials for the job

Reserve cables, pipes and fittings for a specific job before the next stage starts.

Crews and attendance

Assign crews to sites and check attendance confirmed by the team from their phones.

A scope change with approval

Describe the extra work, its cost and its effect on the deadline. Keep the customer's decision before the change begins.

WHY IT MATTERS

Keep what you know about the installation before it disappears behind the finishes.

INSTALLATIONHANDOVERWARRANTY

PHONE, PHOTOS AND SPREADSHEET

Knowledge scattered across crews

  • Photos of penetrations sit on installers' phones, with no place on the drawing
  • Handover documentation is pieced together from messages and notes
  • Material ordered for one site goes to another
  • An extra point agreed verbally comes back as a dispute at settlement
  • Years later, it helps to know who did the installation and when
MIVARE SITES

Every installation point with its history

  • A marker where the work was done, with photos and material data
  • The penetration register is ready before the handover
  • Material reserved on the project that needs it
  • A scope change with its value, deadline and customer approval
  • A building with its project history, from installation to servicing
SERVICING AFTER INSTALLATION

Fire safety installations also mean inspections. They have their own module.

If you service fire safety equipment after installation, the equipment register, inspection dates, reports and service technicians' routes are described on a separate page.

Fire safety for buildings
One building, many years of work.

Installation, handover and later inspections recorded with the same building.

TRIAL PERIOD

Upload the floor plan of one building and place the first marker.

Add the building where you are doing an installation right now, upload a floor plan and mark the first penetration. You will see what documentation looks like when it is created along with the work.

The features described here are included in the licence price.

Try it free for 30 days
  • Do I need to install anything? No. The system runs in the browser.
  • Do I need a payment card? No. The trial period does not require payment details.
  • Where do I start? Start with one building where installation is under way.