A building with its history
Keep the history of a building, hall or unit: from installation and handover to later servicing work.
BUILDINGFLOOR PLANMARKERHANDOVER
Keep the history of a building, hall or unit: from installation and handover to later servicing work.
Mark the spot of a penetration, seal, measurement or defect on the floor plan, so your team can find it more easily.
Record the material, fire resistance and seal number. Attach photos of the installation and the label.
Check which points have been done and approved, and which need correcting.
For each issue, set the priority, the person responsible and the deadline. Record too whether the defect affects the schedule.
Reserve cables, pipes and fittings for a specific job before the next stage starts.
Assign crews to sites and check attendance confirmed by the team from their phones.
Describe the extra work, its cost and its effect on the deadline. Keep the customer's decision before the change begins.
INSTALLATIONHANDOVERWARRANTY
If you service fire safety equipment after installation, the equipment register, inspection dates, reports and service technicians' routes are described on a separate page.
Fire safety for buildingsInstallation, handover and later inspections recorded with the same building.
Add the building where you are doing an installation right now, upload a floor plan and mark the first penetration. You will see what documentation looks like when it is created along with the work.
The features described here are included in the licence price.
Mivare Sites
We use the files the site needs to work. Google Analytics, which shows us which pages are useful, runs only after you agree to it. Without consent, no data is sent to Google.
Necessary
Technical files the site needs to work properly and to remember your choice.
You will find the details in our Privacy policy and Cookie policy. You can change your choice at any time from the site footer.